Kinzel Contracting LLC

Process

A predictable sequence so Cleveland homeowners know what happens each day on site.

  1. 01

    Tear-out

    Protect floors and adjacent spaces, remove the existing tub or shower, and open a clean work area.

  2. 02

    Plumbing — drain & valve

    Redo the drain and valve plumbing so the new unit sits on solid, code-minded work — not a patch over old problems.

  3. 03

    Base in concrete

    Set and level the base in concrete. This is the foundation for a lasting install.

  4. 04

    Samuel Mueller walls

    Install the 3-piece wall system, seal joints, and check waterproofing details.

  5. 05

    Finish & handoff

    Fixtures, trim, cleanup, and a walkthrough so you know what was done and how to care for it.

Request a quote