Residential bathroom remodeling only — scoped so timelines stay honest.
Timeline: ~1 week
Full bathroom remodel
A full residential bathroom refresh. We tear out the old unit, redo the drain and valve plumbing, set the base in concrete, and install Samuel Mueller 3-piece walls — then finish trim and walk through the space with you.
Timeline: ~2 days
Shower & tub
When you need the wet area replaced without a full-room rebuild. Same plumbing and wall standards, compressed schedule — typically about two days on site.